10RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEA Guide to the New ADA-ABA Accessibility GuidelinesOn July 23, 2004, the U.S. Access Board, a
11 ATM INSTALLATION FOR ACCESSIBILITY305 Clear Floor or Ground Space305.1 General. Clear floor or ground space shall comply with 305.305.2 Floor or Gr
12RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDE305.7 Maneuvering Clearance. Where a clear floor or ground space is locatedin an alcove or ot
13 ATM INSTALLATION FOR ACCESSIBILITYFigure 308.2.1 Unobstructed Forward Reach308.2.2 Obstructed High Reach. Where a high forward reach is over an ob
14RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEFigure 308.3.1 Unobstructed Side Reach308.3.2 Obstructed High Reach. Where a clear floor or
15ATM INSTALLATION FORACCESSIBILITY1. This document supercedes all otherinformation provided by Triton forATM installation for accessibility.2. Inform
16RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDE(b) Reach Depth More Than 10inches (255 mm). Where the reachdepth to the operable parts of an
174.2.4.2 Relationship of Maneuver-ing Clearance to Wheelchair Spaces.One full unobstructed side of the clearfloor or ground space for a wheelchairsha
18RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEFor a front approach, where the depthof the alcove is equal to or less than 24inches (610 mm)
19Figure 6a. Parallel approach - sidereach.Figure 6b. Parallel approach - high/low side reach.Figure 5a. Forward reach, unobstructed.Figure 5b. Forwar
2RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDE FEDERAL COMMUNICATIONS COMMISSION (FCC) COMPLIANCEStatement of Compliance: This equipment
20RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEFigure 6c. Side reach, obstructed.Figure 7. ADA access dimensions for ModelRT2000 through-th
21SITE PREPARATION/INSTALLATION
22RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEINTRODUCTIONThe Triton RT2000 is a self-serviced, weatherized terminal adaptable for anysuita
23EXTERIOR WALL DIMENSIONSThe following illustration shows the nominal wall area dimensions required forinstallation. The height of the opening is fro
24RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDECONTROL PANEL TRIMThe following illustration shows the Control Panel Trim dimensions and maxi
25SITE PREPARATION/INSTALLATIONDETERMINE IF UNIT NEEDS A PLINTHTriton Systems offers two (2) metal-constructed optional plinths w/leveling feet. A“pl
26RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDECABINET DIMENSIONS (REAR VIEW)** Distance if interior floor and exterior ground are the same
27SITE PREPARATION/INSTALLATIONSubtract thickness of wall to determine distance from the inside wall to the back ofcabinet. Maximum wall thickness is
28RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEEnsure that doorways and corridors leading to the point of installation are wideenough to all
29SERVICE AREA/ACCESSSITE PREPARATION/INSTALLATION
3If the equipment is causing harm to the network, the telephone company may requestthat you disconnect the equipment until the problem is resolved. R
30RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDESECURING UNITIt’s recommended that the unit be secured to the facility floor and/or plinth st
31INSTALLING CABINET THROUGH WALL OPENING1. Carefully inspect the unit for anyshipping damage and report anydamage immediately to theshipping company.
32RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDE7. Slide/move the unit forwardtowards the wall opening so thesleeve protrudes slightly out th
33SITE PREPARATION/INSTALLATIONSleeve11. Adjust the plinth’s leveling feet to ensure the control panel trim is flush againstthe exterior wall and the
34RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEAdjusting Height/Level of UnitTriton Systems offers two (2) metal-constructed optional plinth
35INSTALLING CONTROL PANEL TRIM1. Locate the control panel trimincluded with the unit accessories.Loosen the three (3) thumbscrewsuntil the ends are f
36RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDE4. Open the cabinet sleeve door. Tosecure the fascia, five (5) screws(K40x12 - included in ac
37SITE PREPARATION/INSTALLATION6. Next, connect the power cable tothe LED circuit board as shown inFigure 8.7. With 2 persons (inside/outside),slide t
38RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDESEALING THE CONTROL PANEL TRIMTo ensure that the temperature around the unit is maintained du
39SITE PREPARATION/INSTALLATIONHEIGHTS TO MAIN CONTROL PANELWallExterior ground)dnuorgroiretxemorf(smetIlenaPlortnoCniaMotsthgieHsenilediuGyalpsiDpoTy
4RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDENOTICE:The RENassigned to each terminal device provides an indication of the maximumnumber of
40RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDETHIS PAGE INTENTIONALLY LEFT BLANK
41POWER AND DIAL-UP COMMUNICATION
42RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDETEMPERATURE/HUMIDITY1. The ATM will operate over arange of temperatures and hu-midity. Genera
43POWER AND DIAL-UP COMMUNICATIONFigure 2. Install snap bushing.3. Install the supplied snap bushinginto the access hole that carries thepower and pho
44RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDETHIS PAGE INTENTIONALLY LEFT BLANK
45OPERATOR SERVICE PANEL INSTALLATION
46RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEINSTALLING THE OPERATOR SERVICE PANEL (OSP)The panel is shipped in the auxilliarybox. Follow
47OPERATOR SERVICE PANEL INSTALLATION6. Connect the data cable (RJ-45connector end) to the OSP shownin Figure 3. Ensure the other endof cable is conne
48RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDETHIS PAGE INTENTIONALLY LEFT BLANK
49TDM-SERIES CASSETTE INSTALLATION
5EMISSIONS (EMI)This device complies with Part 15 of the FCC rules. Operation is subject to thefollowing two (2) conditions:1) This device may not c
50RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDE2. Insert the currency cassette(s) into its compartment(s) in the dispenser. Slidethe rejec
51PRINTER PAPER INSTALLATION
52RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEINSTALLING THE PRINTER PAPER ROLLThe receipt paper and paper spool areincluded in the accesso
53ETHERNET (TCP/IP) / VSAT CABLEINSTALLATION
54RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDETCP/IP (ETHERNET)Ethernet is the most popular LAN technology in use today. The IEEE standard
55VSAT (VERY SMALL APERTURE TERMINAL)VSAT stands for “Very Small Aperture Terminal” and refers to receive/transmitterminals installed at dispersed sit
56RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDETHIS PAGE INTENTIONALLY LEFT BLANK
6RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEWhat’s in This Installation GuideThis Installation Guide provides information for the preparat
7RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDEINTRODUCTIONThis document contains the information necessary for the preparation and installa-
THIS PAGE INTENTIONALLY LEFT BLANK8RT2000 SERIES - SITE PREPARATION AND INSTALLATION GUIDE
9ATM INSTALLATION FOR ACCESSIBILITY